Dashboard: iteration 2 graphs

Dashboard: iteration 2 graphs

Delivery Process Performance metric visualizations: iteration 2 (P.d.)

The value stream considered are:

  • meta-agl repository (layer) at the commit stage

  • UCB builds at integration stage

ucb-delivery-process-visualization-matrix-iteration-2.png

 

Sampling period: 3 months

25th percentile: green

Observation duration: from 2023-06-01 to 2025-06-01

50th percentile: blue

Y axis: days

75th percentile: red

Commit stage

Throughput

Commit lead time (P.d.2.1.)

meta-agl-commit-stage-lead-time.png

Commit Time Interval (P.d.2.2.)

meta-agl-commit-stage-time-interval.png

Integration stage

Throughput

Integration Lead time (P.d.2.3.)

meta-agl-integration-stage-lead-time.png

 

Integration Time Interval (P.d.2.4.)

meta-agl-integration-stage-time-interval.png

Stability

Integration Failure Recovery Time (P.d.2.5.)

meta-agl-integration-stage-failure-recovery-time.png

Integration Change Failure Rate (P.d.2.6.)

meta-agl-integration-stage-change-failure-rate.png