Dashboard: iteration 2 graphs
Delivery Process Performance metric visualizations: iteration 2 (P.d.)
The value stream considered are:
meta-agl repository (layer) at the commit stage
UCB builds at integration stage
Sampling period: 3 months | 25th percentile: green |
Observation duration: from 2023-06-01 to 2025-06-01 | 50th percentile: blue |
Y axis: days | 75th percentile: red |
Commit stage
Throughput
Commit lead time (P.d.2.1.)
Commit Time Interval (P.d.2.2.)
Integration stage
Throughput
Integration Lead time (P.d.2.3.)
Integration Time Interval (P.d.2.4.)
Stability
Integration Failure Recovery Time (P.d.2.5.)
Integration Change Failure Rate (P.d.2.6.)